MRL compliance starts in the field, not in the lab report.

A certificate of analysis is a photograph of the past. By the time it shows a problem, the problem is in your warehouse. The only reliable MRL strategy is the one that runs before purchase.

Why dried herbs fail more often than fresh produce

Pesticide limits in the EU are set by Regulation 396/2005, and where no specific limit exists, a default of 0.01 mg/kg applies — close to the limit of detection. Dried herbs carry an extra handicap: drying removes most of the water but not the residues, concentrating whatever was on the fresh leaf several-fold. A spray that would have been unremarkable on fresh mint can put a dried lot comfortably over the limit.

Add compounds that arrive from outside the field — chlorate from chlorinated wash water, residues drifting from a neighbour's cotton — and you see why testing alone is not a strategy. Testing tells you which lots to reject. It doesn't produce lots you can accept.

The controls that actually work

  1. Contracted, named plots. If you don't know which field a lot came from, no other control is real. Plots should be mapped and contracted before the season starts, so every downstream record hangs on a named piece of land.
  2. An approved-inputs list, agreed before sowing. The grower should know from day one which plant-protection products are acceptable for the destination market — and which ones end the contract.
  3. Spray diaries, kept per plot and per application. Product, dose, date. Boring, and decisive: the diary is what turns a residue result from a mystery into a traceable event.
  4. Pre-harvest interval (PHI) enforcement. Most MRL failures are not exotic chemistry — they are legal products sprayed too close to picking. Insist the PHI is enforced and recorded, not assumed.
  5. A field-sample screen before purchase. Require that, before a plot's harvest is committed, a field sample goes to an ISO/IEC 17025 laboratory for a multi-residue screen — and that a field which fails is not bought. This is the single control that changes the economics: rejection happens at the farm gate, not at Rotterdam.

What a commercial lot should ship with

The commercial lot should then carry its own ISO/IEC 17025 report referencing EU Reg. 396/2005, tied back to the plots of origin along with the spray diary, PHI record and custody chain.

Three questions for any supplier

  • Can you name the plots behind this lot — and show the spray diary?
  • Was a residue screen done before you bought from the farmer, or only after?
  • Which laboratory ran the panel, and is it ISO/IEC 17025-accredited?

A supplier with real field controls answers all three in one email, with documents attached rather than assurances.

To be plain about our own position: we do not yet buy from contracted plots — no crop has been purchased and no laboratory is yet appointed. The programme above is what we are designing, and we will name the growers and the laboratory when they exist.

Assess us early.

We will tell you in writing what we can and cannot meet, and by when.

Send us your specification